SUMMARY
Shi Jinfeng, Wang Jiren, Wang Laigui +6 more
annual productivity of three million tons. As the completion of the coal mine, the enterprise was closed and interrupted. With 50 years of mining, a large pit was formed with 3.9 km long, 2 km wide, 350 m deep, and one billion square meters volume. How to deal with this large pit after completion of the mine had already put onto the agenda of local government even before its closure. It is pointed in this paper that the formation of the pit experienced half century mining process. Its perfect rail transportation system, drainage system, power supply system, bottom inclined shaft mining heritage, water and sand refill heritage, different types of motor vehicles, mining machineries used for open and under mining all represented advanced international mining technologies. These heritages have extremely high scientific value. The mining bed cutting surface, geology structure, and fossil…