arXiv.itsnick.co

an independent field guide to 23 million papers from arXiv & OpenAlex — not affiliated with arXiv.org

Author

Inspection Objectives

7 papers · 2011–2013

2011: 22012: 22013: 3
2011peak 3 in 20132013

Frequent co-authors

Papers

showing 1–7 of 7 RSS

NRC INSPECTION MANUAL INSPECTION PROCEDURE 43003 QVIB/MVIB/EVIB PROGRAM APPLICABILITY: 2507 REACTIVE INSPECTIONS OF NUCLEAR VENDORS

Inspection Objectives

Information Systems · · cited 0× · OpenAlex ↗ · more like this ·

01.01 To obtain additional information about reported problems involving vendors supplying basic components. Verify that vendors supplying basic components have taken adequate corrective actions to preclude recurrence of significant conditions adverse to quality. Verify that vendors supplying basic components identified the root cause(s) of a reported deficiency, including evaluation of the adequacy and effectiveness of the vendor's 10 CFR Part 21 program as well as appropriate aspects of the 10 CFR Part 50, Appendix B, quality assurance (QA) program. Verify that vendors supplying basic components have evaluated the deficiency for potential generic implications. Problems may be identified through 10 CFR Part 21 reports, 10 CFR 50.55(e) reports, 10 CFR 50.72 reports (immediate notifications), 10 CFR 50.73 reports (licensee event reports), allegations, and requests from the…

65001.22-02 INSPECTION REQUIREMENTS AND GUIDANCE

Inspection Objectives

Artificial Intelligence · · cited 0× · OpenAlex ↗ · more like this ·

01.01 To verify that the combined license (COL) holder (licensee) has developed the digital instrumentation and control (DI&C) system as committed in the licensing basis. 01.02 To confirm by inspection that the COL licensee has adequately implemented the DI&C development process to yield a system that meets the acceptance criteria in the

ATTACHMENT 65001.23 INSPECTION OF HUMAN FACTORS ENGINEERING INTEGRATED SYSTEM VALIDATION ITAAC PROGRAM APPLICABILITY: 2503

Inspection Objectives

Artificial Intelligence · · cited 0× · OpenAlex ↗ · more like this ·

01.01 To confirm by inspection that the combined license (COL) holder (licensee) has implemented a Human Factors Engineering (HFE) integrated system validation (ISV) for the main control room (MCR) and remote shutdown workstation (RSW) designs in accordance with the NRC approved ISV implementation plan. The inspection will be used to support an NRC finding as to whether the ISV implementation and results meet the acceptance criteria as stated in the HFE ISV Inspections, Tests, Analyses and Acceptance Criteria (ITAAC). 65001.23-02 INSPECTION REQUIREMENTS AND GUIDANCE 02.01 Background. Inspection of ITAAC associated with a COL is intended to support the Commission finding stipulated in 10 CFR Part 52.103(g), specifically that the COL acceptance criteria (ITAAC acceptance criteria) have been met, and that the facility has been designed and built to conform to the licensing basis. The…

ATTACHMENT 65001.21 INSPECTION OF PIPE RUPTURE HAZARDS ANALYSES (INSIDE AND OUTSIDE CONTAINMENT) DESIGN ACCEPTANCE CRITERIA (DAC)-RELATED ITAAC PROGRAM APPLICABILITY: 2503

Inspection Objectives

Cultural Studies · · cited 0× · OpenAlex ↗ · more like this ·

01.01 To verify that the pipe break hazard analysis report, as defined in the Design Certification Document (DCD) was completed in accordance with the methodology called out in the DCD, and any additional requirements provided in license conditions in the COL FSAR. 01.02 To determine whether licensee records establish an adequate basis for the acceptance for closure of Inspection, Test, Analysis and Acceptance Criteria (ITAAC) for the as-designed pipe rupture hazards analysis report.

PROGRAM APPLICABILITY: 2515

Plant Procedures, Inspection Objectives

Education · · cited 0× · OpenAlex ↗ · more like this ·

01.01 To verify that plant procedures are reviewed and approved � in accordance with technical specifications and regulatory � requirements. 01.02 To verify that the technical adequacy of procedures is � consistent with desired actions and modes of operation. 01.03 To verify the usability of procedure content and format by � determining the degree to which accepted human factors principles � have been incorporated. 01.04 To verify that temporary procedure changes were made in � accordance with plant administrative procedures and technical � specification requirements. 42700-02 INSPECTION REQUIREMENTS 02.01 Sample Selection. Select a sample of at least 15 � procedures for review. The sample should reflect any instances � where problems with procedures have been documented in LERs, NRC � inspection reports, or licensee assessments or audits. Other � significant activities that may also…

41500-02 INSPECTION REQUIREMENTS

Inspection Objectives

Sociology and Political Science · · cited 0× · OpenAlex ↗ · more like this ·

01.01 To ensure that a training inspection is an appropriate � response to identified performance problems. 01.02 To ensure that the training and qualification programs for � nuclear power plant personnel are developed, implemented, � evaluated, documented, and maintained as required by 10 CFR 50.120 � and allowed by 10 CFR 55.

INSPECTION OF ITAAC-RELATED INSTALLATION OF REACTOR PRESSURE VESSEL AND INTERNALS PROGRAM APPLICABILITY: 2503

Inspection Objectives

Safety Research · · cited 0× · OpenAlex ↗ · more like this ·

01.01 Verify that the purchased RPV and internal components are in accordance with the approved design. 01.02 Verify that the RPV and internal components are properly stored and handled in accordance with approved procedures. 01.03 Verify by observation or records that the RPV is installed in accordance with design drawings. 01.04 Verify that procedures for protection of the installed reactor vessel are being followed. 01.05 Verify that RPV internals are installed in accordance with approved procedures and design requirements. 01.06 Verify that the RPV head is installed in accordance with contractor and licensee procedures. 01.07 Verify that documentation packages for the RPV and internals installation are thorough and accurate. 01.08 Verify that problems identified during the inspection are entered into the