ICONE23-1982 DIAGNOSTICS AND LIFE-CYCLE ASSESSMENT OF MEDIUM-VOLTAGE CABLES IN NUCLEAR POWER PLANTS DURING REGULAR OVERHAUL PROCESS

Simon Podkoritnik, Marko Jansa, Stanko Manojlovič

· The Proceedings of the International Conference on Nuclear Engineering (ICONE)

See on the map

Abstract

The reliability of operation of a nuclear power plant substantially depends on the reliability of its individual components. Electric cables, particularly medium-voltage cables represent an important constituent of the nuclear island as well as of the balance of plant. It can't be considered as satisfactory that the redundancy of a particular subsystem is ensured. For this purpose it is important to check the cable insulation condition, which is supposed to be carried out during the overhaul activities. The lifetime of medium-voltage cables is estimated to attain somewhere around 40 years. However, due to electrical, thermal and mechanical stresses it may be significantly reduced. In order to avoid its likely failures and following outages the insulation must be tested regularly. Based on obtained testing results the condition of a cable or cable termination can be assessed and repair or replacement made, if necessary. The article presents some of most important non-destructive diagnostic measurements on cable connections recommended to be done during the overhaul of a nuclear power plant following a good practice of asset maintenance management.

More like this