Physics · physics.acc-ph
Status Report on the 5 Mev Iphi RFQ
R. Ferdinand, P-Y. Beauvais, R. Duperrier, A. France, J. Gaiffier, J-M. Lagniel, M. Painchault, F. Simoens, CEA-Saclay, DSM-DAPNIA-SEA, P. Balleyguier, CEA-Bruyeres le Chatel, DAM
See on the mapAbstract
A 5-MeV RFQ designed for a proton current up to 100-mA CW is now under construction as part of the High Intensity Proton Injector project (IPHI). Its computed transmission is greater than 99 %. The main goals of the project are to verify the accuracy of the design codes, to gain the know-how on fabrication, tuning procedures and operations, to measure the output beam characteristics in order to optimise the higher energy part of the linac, and to reach a high availability with minimum beam trips. A cold model has been built to develop the tuning procedure. The present status of the IPHI RFQ is presented.
References
0 of 9 references are in the index.
Cited by
No paper in the index cites this yet (Semantic Scholar counts 10 in total).
The cited-by list is still filling in while reference lists are collected.